Close
  Indian J Med Microbiol
 

Figure 1: A schematic diagram of the overground match simulation. The simulation was performed with the participants performing either backwards running or side stepping around the first field pole (dashed line), followed by forwards running through the course, navigating the middle three field poles

Figure 1: A schematic diagram of the overground match simulation. The simulation was performed with the participants performing either backwards running or side stepping around the first field pole (dashed line), followed by forwards running through the course, navigating the middle three field poles